EECO LTD WIS A CONTRACT TO BUILD A RAINWATER HARVESTING PROJECT AT KWESIMU PRIMARY SCHOOL

 In December 2012 EECO LTD wan a contract with Diana Women ,Group to build a 16,000 liters capacity rainwater harvesting  project worthy 5000 USD Donated by Aredal Soloptimist Club of Norway. the construction goes on
Chief  fundi Mr  Issa  on the tank  and Mr Kamugisha behind during site visit on  17January 2013

Fundis  at work on the storage tank 16 m3

DP under initial stages of of construction
Mr Kamugisha  pose with Diana  secretary ms  Singano  and Mrs Felix  during site visit at Kwesimu Primay school

EECO LTD WIND A CONTRACT TO BUILD RAINWATER HARVESTING SYSTEM AT MABUGHAI PRIMARY SCHOOL

Nuru Women Group assistant chair person  Ms Kiondo (right ), the head teacher for Mabughai with black coat and other Nuru members supervise ongoing construction works

Mr Kamugisha Arendal Soloptimist club representative in Tanzania inspects the on going construction works at Mabughai with Nuru women group members and headteacher in the background

Eng Nshunju poses with his bosses Nuru women Group on site visit occasions
EECO LTD recently signed a deal with Nuru Women Group of Lushoto Tanga region Tanzania to construct 30 liter capacity water harvesting system  at Mabughai primary school with donors from Norway based club Arendal soloptimist Club. the project is worthy 6250 USD. the system is composed of three 10 ltrs ferro cement tanks arranged in series , a chain of gutters and two stand ponit to cater for about 700 pupils for basic drinking water and sanitation facilities

NGAZI SECONDARY SCHOOL GETS NEW CLASSROM BUILT BY EECO LTD

John nshunju MD for ECCO LTD admires well done job at Ngazi secondary school

Mr Jamal Issa ( left) who did carpentry works poses with women who fetched water for construction

Fundi Nico who did the painting putting final layers of paint at the  blackboard

Fundi Ellance in front, Isaa in the center and Nico behind  are key fundis who built this classroom
In December 2012 EECO lTd successfully completed the classroom building contract and handed the building to the school administration