Kizara water harvesting project ready for Handing Over

Pipe technician Mr Mwambashi doing final touches  on the system

Eng John testing the first flush Diversion unit

Head teacher Mr Malick  cerebrate the complete system

The Headteacher Mr Malick with pupils pose  with their new system

Kizara primary School water harvesting project was designed to cater for 759 pupils and 23 staff.The system  is  composed of   corrugated iron roof catching area of  22 x 8  m 2 connected to the  series of rainwater gutters , which empty water into  a first flush  division unit and finally  to the first cement jar  tank. The series of 5 tanks  tanks of 3000 liters each are connected  in such a way outflow of the first one become inlet of the following tank.  There are 5 tanks linked to a domestic point with four taps.

  A new and innovate rainwater harvesting  project  donated by Soloptimist  international Action Fund , Arendal solopmist  club of  norway and  Nuru women group  has successfully been constructed  by EECO LTD  under the design and  supervision of Eng.John Nshunju the Company managing director.The project was designed and estimated to cost    7 906 800.00 Tshs equivalent to  USD